Availability: | |
---|---|
Quantity: | |
Transform texture like real wood on profile surface, without mechanical lines, corrosion-resistant, durable. Avaliable in all kins of wooden pattern, 3D/4D wooden grain, powder coating wooden and electrophoresis wooden grain.
1. Type: Wood Grain Aluminum Extrusion Tube / Hang Ceiling Aluminum Decoration Extrusion
2. Dimensions can be customized
3. Material: AL6063
4. Surface treatment: anodizing
5. Application: Medical/Communication/Automotive Electronics equipment, Home Appliances...
6. RoHS Directive-compliant
7. ISO 9001: 2008 & TS16949 management system
8. High-Tech Enterprise
9. Inspection machines CMM, projector to assure the quality requirements
10. Thermal simulation and prototyping services
11. OEM/ODM orders are welcome
Packaging: standard export package, we can also accept other requirment s from client.
Shipping:
1. The sample will be shipped by express, like FEDEX, DHL, UPS and EMS. And the freight should be paid by clients.
2. FOB Shanghai for mass production. The freight will deal with you for the concrete condition.
3. Delivery Time: 3 weeks after confirming all informations.
Transform texture like real wood on profile surface, without mechanical lines, corrosion-resistant, durable. Avaliable in all kins of wooden pattern, 3D/4D wooden grain, powder coating wooden and electrophoresis wooden grain.
1. Type: Wood Grain Aluminum Extrusion Tube / Hang Ceiling Aluminum Decoration Extrusion
2. Dimensions can be customized
3. Material: AL6063
4. Surface treatment: anodizing
5. Application: Medical/Communication/Automotive Electronics equipment, Home Appliances...
6. RoHS Directive-compliant
7. ISO 9001: 2008 & TS16949 management system
8. High-Tech Enterprise
9. Inspection machines CMM, projector to assure the quality requirements
10. Thermal simulation and prototyping services
11. OEM/ODM orders are welcome
Packaging: standard export package, we can also accept other requirment s from client.
Shipping:
1. The sample will be shipped by express, like FEDEX, DHL, UPS and EMS. And the freight should be paid by clients.
2. FOB Shanghai for mass production. The freight will deal with you for the concrete condition.
3. Delivery Time: 3 weeks after confirming all informations.